dc.contributor |
Universidade Federal de Santa Catarina |
pt_BR |
dc.contributor.advisor |
Stemmer, Marcelo |
|
dc.contributor.author |
Savi, Rafael Vendramini |
|
dc.date.accessioned |
2019-07-15T18:38:28Z |
|
dc.date.available |
2019-07-15T18:38:28Z |
|
dc.date.issued |
2017 |
|
dc.identifier.uri |
https://repositorio.ufsc.br/handle/123456789/197618 |
|
dc.description |
TCC(graduação) - Universidade Federal de Santa Catarina. Centro Tecnológico. Engenharia de Controle e Automação. |
pt_BR |
dc.description.abstract |
O trabalho de conclusão de curso descrito neste documento foi realizado na
sede da empresa Bosch Rexroth AG, em Lohr am Main, Alemanha. Pertencente ao
grupo Robert Bosch GmbH, ela foca em sistemas de acionamento e controle elétrico,
hidráulico e mecânico tanto em máquinas móveis como industriais. O departamento
responsável por acolher este projeto se chama Marine & Offshore. Nele são
gerenciados tanto projetos submarinos quanto voltados à superfície marítima.
Nos últimos anos, grandes projetos para controle de guinchos de navios têm
surgido, os quais envolvem controle ativo de compensação de ondulações provocadas
por ondas (AHC). Como isso envolve guinchos montados em grandes navios capazes
de erguer centenas de toneladas, o maquinário é extraordinariamente caro, e
consequentemente o teste de controles e comissionamento em campo também é
custoso. Por isso, a fim de possuir um ambiente de testes com condições reais, a
construção de uma bancada de testes na fábrica para simular os equipamentos se
tornou necessária. A sua construção fora começada há alguns anos utilizando um
sistema de testes para guinchos usados na automação de teatros. Porém, durante o
início deste projeto, seu progresso se encontrava estagnado.
Este trabalho foi responsável por retomar o desenvolvimento da bancada de
testes para guinchos offshore, atualizando os objetivos com os desejos e capacidades
atuais dos stakeholders envolvidos. A primeira etapa foi identificar os componentes já
instalados ou em estoque e as funcionalidades já programadas. Posteriormente, a
transcrição dos objetivos dos stakeholders para requerimentos de sistema formou
uma documentação técnica útil para a sucessão do projeto. Neste processo, foram
analisados os aspectos estruturais, hidráulicos e elétricos da bancada de testes. A
comparação entre os requerimentos com a situação atual deu origem ao design de
uma nova arquitetura de sistema, especificando os controles elétricos e suas
conexões. O trabalho termina com a implementação da nova arquitetura de sistema e
com a programação das funcionalidades nos controladores pertencentes à bancada
de testes. |
pt_BR |
dc.description.abstract |
The project described in this document was carried out at the headquarters of
Bosch Rexroth AG in Lohr am Main, Germany. Belonging to the Robert Bosch GmbH
group, it focuses on electric, hydraulic and mechanical drive and control systems in
both mobile and industrial machines. The department responsible for hosting this
project is called Marine & Offshore, and in it both underwater and sea surface projects
are managed.
In recent years, large projects aimed on the control of winches installed on ships
have emerged, which for instance involve active heave compensation (AHC) control
techniques. As this covers winches mounted on large vessels capable of lifting
hundreds of tons, the machinery is extraordinarily expensive, and consequently so is
the testing of controls and commissioning in the field. Therefore, in order to have a
testing environment with real conditions, the construction of a test bench in the factory
to simulate the equipment became necessary. Its construction has begun some years
ago using a test system for winches used in theater automation. However, during the
beginning of this project, its progress was stalled.
This work was responsible for resuming the development of the test bench for
offshore winches, updating the objectives with the current desires and capacities of the
stakeholders involved. The first step was to identify the components already installed
or in stock and the features already programmed. Subsequently, the transcription of
stakeholder objectives for system requirements formed a useful technical
documentation for the succession of the project. This process involved the analysis of
the structural, hydraulic and electric aspects of the test bench. The comparison of
requirements with the current situation gave rise to the design of a new system
architecture, specifying the electrical controls and their connections. This work ends
with the implementation of the new system architecture and programming of
functionalities in the controllers belonging to the test bench. |
pt_BR |
dc.language.iso |
en |
pt_BR |
dc.publisher |
Florianópolis, SC. |
pt_BR |
dc.rights |
Open Access |
|
dc.subject |
Requirements Engineering. Active Heave Compensation. Offshore. Crane. Winch. Test Bench. |
pt_BR |
dc.subject |
Requirements Engineering. Active Heave Compensation. Offshore. Crane. Winch. Test Bench. |
pt_BR |
dc.title |
Development of a Test Bench for Verification of Electric Controls for Offshore Winch & Crane Applications |