dc.contributor |
Universidade Federal de Santa Catarina |
pt_BR |
dc.contributor.advisor |
Camponogara, Eduardo |
|
dc.contributor.author |
Guardini, Luiz Alberto Serafim |
|
dc.date.accessioned |
2019-07-16T17:41:26Z |
|
dc.date.available |
2019-07-16T17:41:26Z |
|
dc.date.issued |
2018 |
|
dc.identifier.uri |
https://repositorio.ufsc.br/handle/123456789/197749 |
|
dc.description |
TCC(graduação) - Universidade Federal de Santa Catarina. Centro Tecnológico. Engenharia de Controle e Automação. |
pt_BR |
dc.description.abstract |
A otimização de desempenho tornou-se uma abordagem padrão para o projeto de controle
de sistemas de energia. Na França, país onde foi realizado o projeto de fim de curso, essa
mesma atividade de pesquisa acontece no setor da construção Civil. Neste segmento, o maior
setor consumidor de energia é o setor residencial terciário, o que torna óbvio um esforço em
novas soluções, permitindo um ganho econômico e ambiental.
A concepção de prédios e edifícios baseia-se geralmente em uma abordagem sequencial,
que primeiro visa a redução da demanda, depois a eficiência energética e finalmente recorre
à utilização de energias renováveis. Ao analisar todos os componentes em conjunto, como
no caso do projeto holístico de construção, é possível obter um ótimo global, que difere em
muitos aspectos do obtido pela segmentação das fases. Para isso, é necessário otimizar o
projeto considerando o edifício como um todo, levando em consideração seu revestimento e
isolação, sistema de trocas de calor, ocupação e o impacto ambiental, tudo isso durante a sua
vida útil.
Existem dificuldades significativas na abordagem holística, por exemplo, o tempo de cálculo
devido à complexidade, a simulação dinâmica do edifício, a explosão combinatória ligada
às variáveis de decisão e parâmetros de otimização, incertezas, etc. O uso de técnicas como
modelos substitutos e computação paralela auxiliam na resolução de alguns destes problemas.
Como muitos aspectos devem ser considerados, a otimização é multi-objetiva e não-linear,
no entanto, para aplicações práticas, a computação deve ser feita em tempo razoável. Além
disso, há a necessidade de intercambiabilidade de diferentes ferramentas (para modelagem,
otimização, tomada de decisão, por exemplo).
O projeto INTENSE apresenta uma metodologia e o desenvolvimento de um ambiente de
programação para a referida otimização holística dos edifícios. Este estágio está situado no
final do projeto, ao passo que a validação para a metodologia e para a ferramenta desenvolvida
deve ser fornecida, assim como uma análise de sensibilidade. |
pt_BR |
dc.description.abstract |
Performance optimization has become a standard approach for the design and control of
energy systems. This same research activity happens in the building sector. It is well known
that in France, the greatest energy consuming sector is the tertiary residential sector, which
makes obvious to focus the effort in new solutions, allowing an economic and environment
gain.
The design of buildings is usually based on a sequential approach, which first accesses the
demand reduction, then checks the energy efficiency and finally targets the use of renewable
energy. When analysing all components together, as in the case of a holistic building design, it
is possible to obtain a global optimum, that differs in many ways from the one obtained by
segmenting the phases. In order to do that, it is necessary to optimize the design considering
the building as a whole, by taking into consideration its envelope, system, occupancy and the
environmental impact, all of it over the buildings life time.
There are significant difficulties on the holistic approach, for instance, calculation time due
to the complexity, dynamics simulation of the building, the combinatorial explosion linked
to the decision variables and parameters on the optimization, uncertainties, etc. The use of
techniques such as surrogate models and parallel computing brings an aid to solve some of
the issues. Since many aspects are to be considered, the optimization is multi-objective and
nonlinear, however, for practical applications, the computation has to be done in reasonable
time. Moreover, there is the necessity of interchangeability of different tools (for modeling,
optimizing, decision making, for instance).
Project INTENSE presents a methodology and the development of a programming environ-
ment for such holistic optimization of buildings. This internship is placed at the end of the
project, whereas validation for the methodology and for the developed tool has to be provided,
as well as a sensitivity analysis has to be made. |
pt_BR |
dc.language.iso |
en |
pt_BR |
dc.publisher |
Florianópolis, SC. |
pt_BR |
dc.rights |
Open Access |
|
dc.subject |
Design de Experimentos, Modelos substitutos, Otimização multiobjetivo, Tomada de decisão. |
pt_BR |
dc.subject |
Design of Experiments, Surrogate models, Multi-objective optimization, Decision Making. |
pt_BR |
dc.title |
Validation and Sensitivity Analysis of an Optimization Platform for Efficient Energy-plus Buildings |