Análise da evolução nos níveis de curto-circuito e superação de disjuntores nos barramentos do Sistema Interligado Nacional decorrentes à entrada em operação de um novo empreendimento de transmissão

DSpace Repository

A- A A+

Análise da evolução nos níveis de curto-circuito e superação de disjuntores nos barramentos do Sistema Interligado Nacional decorrentes à entrada em operação de um novo empreendimento de transmissão

Show simple item record

dc.contributor Universidade Federal de Santa Catarina pt_BR
dc.contributor.advisor Rosa, Mauro Augusto da
dc.contributor.author Salegue, Vitor Saldanha
dc.date.accessioned 2021-05-25T17:43:02Z
dc.date.available 2021-05-25T17:43:02Z
dc.date.issued 2021-05-20
dc.identifier.uri https://repositorio.ufsc.br/handle/123456789/223877
dc.description TCC (graduação) - Universidade Federal de Santa Catarina. Centro Tecnológico. Engenharia Elétrica. pt_BR
dc.description.abstract Este trabalho apresenta estudos realizados com o objetivo de analisar as evoluções nos níveis de curto circuito dos barramentos do Sistema Interligado Nacional (SIN) que a implantação de novos empreendimentos de transmissão pode causar, assim como analisar se existe superação de disjuntores por conta dessas evoluções. São mostradas as metodologias, utilizadas pelo Operador Nacional do Sistema (ONS) e pelos agentes de transmissão do sistema elétrico brasileiro, para análise de superação de disjuntores devido à corrente de curto-circuito simétrica, assim como os critérios que norteiam as análises de evolução nos níveis de curto-circuito decorrentes à entrada em operação dos novos empreendimentos. É apresentado um estudo de curto circuito que avalia o impacto que uma subestação específica causa no Sistema Interligado Nacional, seguindo os critérios citados acima. pt_BR
dc.description.abstract This work presents studies made in order to analyze the evolutions in short-circuit levels of the buses of the National Interconnected System (SIN) that the implementation of new transmission facilities can cause, as well as to analyze if there is overrating of circuit breakers due to these evolutions. The methodologies used by the National System Operator (ONS) and by the transmission agents of the Brazilian electrical system for analysis of overrating of circuit breakers due to the symmetrical short-circuit current, as well as the criteria that guide the evolution analyzes in the short-circuit levels resulting from the implantation of new undertakings are shown. A short-circuit study that assesses the impact that a specific transmission undertaking causes on the National Interconnected System is presented, following the criteria mentioned above. pt_BR
dc.format.extent 99 f. pt_BR
dc.language.iso pt_BR pt_BR
dc.publisher Florianópolis, SC pt_BR
dc.rights Open Access
dc.subject Curto-circuito pt_BR
dc.subject Sistema Interligado Nacional pt_BR
dc.subject Superação pt_BR
dc.subject Disjuntores pt_BR
dc.subject Evolução pt_BR
dc.subject Empreendimentos de transmissão pt_BR
dc.title Análise da evolução nos níveis de curto-circuito e superação de disjuntores nos barramentos do Sistema Interligado Nacional decorrentes à entrada em operação de um novo empreendimento de transmissão pt_BR
dc.type TCCgrad pt_BR
dc.contributor.advisor-co Nunes, Júlia Xavier Magno


Files in this item

Files Size Format View Description
TCC_Vitor_Saldanha_Salengue.pdf 2.343Mb PDF View/Open TCC

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account

Statistics

Compartilhar