Estudo do modelo SMAP/ONS para a projeção de vazões de usinas hidrelétricas

DSpace Repository

A- A A+

Estudo do modelo SMAP/ONS para a projeção de vazões de usinas hidrelétricas

Show simple item record

dc.contributor Universidade Federal de Santa Catarina pt_BR
dc.contributor.advisor Finardi, Erlon Cristian
dc.contributor.author Pivoto, Marcelo Witt
dc.date.accessioned 2022-05-04T13:19:41Z
dc.date.available 2022-05-04T13:19:41Z
dc.date.issued 2022-04-25
dc.identifier.uri https://repositorio.ufsc.br/handle/123456789/234269
dc.description TCC (graduação) - Universidade Federal de Santa Catarina. Centro Tecnológico. Engenharia Elétrica. pt_BR
dc.description.abstract A grande dimensionalidade e parcela de usinas hidrelétricas no SIN tornam o problema do planejamento da operação energética bastante complexo, exigindo uma gestão minuciosa dos recursos hidroenergéticos. A complexidade da operação está muitas vezes inserida no despacho dependente entre usinas hidrelétricas em cascata. Logo, para uma gestão ótima dos recursos hídricos, diretamente relacionada ao despacho e custo do sistema, os dados de entrada de vazão dos modelos computacionais precisam representar a previsão mais assertiva possível, mesmo com todas as incertezas relacionadas. As incertezas dos modelos hidrológicos estão concentradas principalmente nas incertezas da precipitação, devido à estocasticidade das chuvas. Para a representação de previsões de curto prazo e programação diária, o ONS utiliza o modelo chuva-vazão determinístico denominado SMAP, cuja modelagem é objeto de análise deste trabalho. Já a partir da segunda semana do modelo de curto prazo e médio prazo, outros modelos estocásticos são utilizados, permitindo assim uma análise de risco sistêmico. A estrutura do modelo estudada é conforme a utilizada pelo operado no PMO de janeiro de 2022, assim como os dados de precipitação e parâmetros de bacias. pt_BR
dc.description.abstract The large dimension and high participation of hydroelectric plants in the Interconnected Brazilian Power System makes the operation planning problem quite complex, demanding a thorough managment of hydropoower resources. The complexity of the operation is often embedded in the dependency of the dispatch between hydropower plants in cascade. Therefore, for an optimal management of water resources, related to the total cost of the system, the inflow input data of computational models has to represent the most assertive forecast possible, even with all the related uncertainties. The uncertainties of the hydrological models are mainly concentrated in precipitation, due to the stochasticity of the rains. For the representation of short-term and daily forecasts, the Electrical System National Operator uses the deterministic rain-flow model called SMAP, whose modeling is the object of analysis of this work. From the second week of the short term model and long term model, other stochastic models are used, thus allowing a systemic risk analysis. The structure of the model is the one used by the Operator in the January’s 2022 Mensal Operating Program, as well as precipitation data and basin parameters. pt_BR
dc.format.extent 67 f. pt_BR
dc.language.iso pt_BR pt_BR
dc.publisher Florianópolis, SC pt_BR
dc.rights Open Access
dc.subject Modelo chuva-vazão pt_BR
dc.subject SMAP/ONS pt_BR
dc.subject previsão de vazões pt_BR
dc.title Estudo do modelo SMAP/ONS para a projeção de vazões de usinas hidrelétricas pt_BR
dc.type TCCgrad pt_BR


Files in this item

Files Size Format View Description
TCC MWP.pdf 1.924Mb PDF View/Open TCC

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Browse

My Account

Statistics

Compartilhar