Estudo do Custo de Implantação de uma Central de Triagem de Resíduos Sólidos da Construção Civil para Atender a Cidade de Ijuí
Show simple item record
dc.contributor.author |
Mello, Leonardo Brizolla de |
|
dc.contributor.author |
Buske, Lucas Rotili |
|
dc.contributor.author |
Nadalin, Rafael Pereira |
|
dc.contributor.author |
Amaral, Bibiana dos Santos |
|
dc.contributor.author |
Oliveira, Joice Viviane de |
|
dc.date.accessioned |
2023-03-22T12:12:41Z |
|
dc.date.available |
2023-03-22T12:12:41Z |
|
dc.date.issued |
2018-04-18 |
|
dc.identifier.issn |
2596-237X |
|
dc.identifier.uri |
https://repositorio.ufsc.br/handle/123456789/245244 |
|
dc.description.abstract |
O trabalho consiste na criação de um projeto de um galpão de triagem a partir da quantificação de
Resíduos da Construção Civil obtida pelo método indireto. Para verificar se há viabilidade de
implantação do empreendimento no município, utilizou-se o levantamento e comparação dos
resultados pela Taxa Interna de Retorno e a Taxa Mínima Atrativa. Os resultados do volume de RCC
aferidos a partir dos parâmetros indireto para o município, em um período de 4 anos, retratou uma
média de 49,96 t/dia ou 1498,78 t/mês. Nesse estudo optou-se por dimensionar uma usina de triagem
composta com equipamentos com capacidade de processar 50 t/dia. De acordo com os cálculos do
Valor Presente Líquido, para que a implantação da central seja economicamente viável, deverá
possuir um tempo de operação igual ou superior a nove anos, uma vez que para tempos a partir do
referido o VPL possuirá valores positivos, significando que haverá o retorno financeiro do valor
investido. |
pt_BR |
dc.description.abstract |
The article consists in the creation of a project of a shed of sorting from the quantification of
Construction Waste obtained by the indirect method. In order to verify if there is feasibility of
implantation of the enterprise in the municipality, we used the survey and comparison of the results
by Internal Rate of Return and the Minimum Attractive Rate. The results of the RCC volume
measured from the indirect parameters for the municipality over a period of 4 years showed an
average of 49.96 t / day or 1498.78 t / month. In this study it was chosen to size a composite sorting
plant with equipment capable of processing 50 t / day. According to the calculations of the Net
Present Value, for the implantation of the plant to be economically viable, it must have a time of
operation equal to or greater than nine years, since for times from that said the NPV will have
positive values, meaning that there will be a financial return of the amount invested. |
pt_BR |
dc.language.iso |
por |
pt_BR |
dc.publisher |
Grupo de Pesquisa Virtuhab/ UFSC |
pt_BR |
dc.subject |
Separação; |
pt_BR |
dc.subject |
Implementação; |
pt_BR |
dc.subject |
Sustentabilidade |
pt_BR |
dc.subject |
Separation; Implementation; Sustainability |
pt_BR |
dc.title |
Estudo do Custo de Implantação de uma Central de Triagem de Resíduos Sólidos da Construção Civil para Atender a Cidade de Ijuí |
pt_BR |
dc.title.alternative |
Study of the Cost of Deployment of a Solid Waste Sorting Plant for Civil Construction to Assist the City of Ijuí |
pt_BR |
dc.type |
Article |
pt_BR |
Files in this item
This item appears in the following Collection(s)
Show simple item record
Search DSpace
Browse
-
All of DSpace
-
This Collection
My Account
Statistics
Compartilhar