Produtividade e custos na concretagem de canais de drenagem de uma usina fotovoltaica
Show simple item record
dc.contributor |
Universidade Federal de Santa Catarina. |
pt_BR |
dc.contributor.advisor |
Mutti, Cristine do Nascimento |
|
dc.contributor.author |
Della Giustina, Luigi de Souza |
|
dc.date.accessioned |
2024-07-15T20:09:08Z |
|
dc.date.available |
2024-07-15T20:09:08Z |
|
dc.date.issued |
2024-06-26 |
|
dc.identifier.uri |
https://repositorio.ufsc.br/handle/123456789/256073 |
|
dc.description |
TCC (graduação) - Universidade Federal de Santa Catarina, Centro Tecnológico, Engenharia Civil. |
pt_BR |
dc.description.abstract |
O potencial solar brasileiro, aliado a reduções significativas de custos na última
década, faz com que a geração de energia solar apresente uma participação cada vez
maior no crescimento da matriz elétrica no país. O Nordeste, devido ao significativo
potencial solar, é o principal foco de expansão para as usinas fotovoltaicas de geração
centralizada. Nesta região o clima é marcado pela ocorrência de chuvas intensas e
concentradas. Por conta dessa característica e da necessidade de alteração do solo
em grandes áreas durante o processo de construção, o sistema de drenagem tornase uma ferramenta fundamental para garantir a operação dos parques solares. Assim,
o presente trabalho busca analisar o custo e a produtividade da execução do
revestimento dos canais de drenagem com extrusora em uma usina solar fotovoltaica
localizada no oeste da Bahia. Além da avaliação dos dois parâmetros citados,
verificou-se as perdas de concreto geradas na execução dos canais com este método
construtivo. Para o estudo, foram utilizados dados coletados entre setembro de 2023
e abril de 2024. Identificou-se as equipes, os quantitativos de materiais e os custos
unitários dos insumos para determinação do montante total para execução da
atividade de concretagem dos canais. A produtividade foi avaliada mensalmente
através das horas trabalhas e do quantitativo executado pela equipe diretamente
envolvida no serviço. Verificou-se que o custo é majoritariamente determinado pelo
volume de concreto utilizado. Além disso, observou-se a influência da forma de
execução das atividades predecessoras na geração de perdas de concreto, assim
como o impacto das chuvas na produtividade. |
pt_BR |
dc.description.abstract |
Brazil's solar potential, coupled with significant cost reductions over the past decade,
has led solar energy generation to play an increasingly larger role in the country's
electrical grid growth. The Northeast, due to its substantial solar potential, is the
primary focus for expanding centrally-generated photovoltaic power plants. This region
experiences a climate characterized by intense and concentrated rainfall. Due to this
characteristic and the need for extensive ground alteration during construction,
drainage systems become crucial tools to ensure the operation of solar parks.
Therefore, this study aims to analyze the cost and productivity of implementing canal
lining with an extruder at a photovoltaic solar plant located in western Bahia. In addition
to assessing these parameters, concrete losses during canal construction using this
method were also evaluated. Data collected between September 2023 and April 2024
were utilized for the study, identifying teams, material quantities, and unit costs to
determine the total amount for concreting the canals. Productivity was assessed
monthly based on hours worked and the quantity executed by the team directly
involved in the service. It was found that costs are primarily determined by the volume
of concrete used. Furthermore, the study observed how the execution of preceding
activities influences concrete losses and the impact of rainfall on productivity. |
pt_BR |
dc.format.extent |
135 f. |
pt_BR |
dc.language.iso |
pt_BR |
pt_BR |
dc.publisher |
Florianópolis, SC. |
pt_BR |
dc.rights |
Open Access. |
en |
dc.subject |
Usina solar fotovoltaica |
pt_BR |
dc.subject |
Custos |
pt_BR |
dc.subject |
Produtividade |
pt_BR |
dc.subject |
Canais de drenagem |
pt_BR |
dc.subject |
Extrusora |
pt_BR |
dc.title |
Produtividade e custos na concretagem de canais de drenagem de uma usina fotovoltaica |
pt_BR |
dc.type |
TCCgrad |
pt_BR |