dc.description |
TCC (graduação) - Universidade Federal de Santa Catarina, Centro Tecnológico, Engenharia de Controle e Automação. |
pt_BR |
dc.description.abstract |
A energia elétrica é fundamental para o desenvolvimento econômico, social e cultural,
sendo essencial no cotidiano de cada indivíduo. No Brasil, a matriz elétrica é predominantemente
renovável, com ênfase nas usinas hidrelétricas. No entanto, a obsolescência
dos equipamentos e a deterioração das infraestruturas, exacerbadas pela
longevidade das instalações e a falta de melhorias contínuas, são problemas comuns.
Dada a dependência do sistema elétrico brasileiro de hidrelétricas, sua modernização
é crucial para garantir a segurança energética e atender à crescente demanda e às
rigorosas regulamentações de eficiência e sustentabilidade. Este trabalho aborda a
modernização do Sistema de Medição de Faturamento (SMF) da Usina Hidrelétrica X
pseudônimo utilizado para proteger informações confidenciais. O SMF é responsável
pela medição e precificação da energia gerada, aspectos vitais para a viabilidade financeira
e operacional da usina. O projeto inclui a concepção e desenvolvimento do
Projeto Executivo de Migração, desde o levantamento de requisitos até a aprovação
final dos documentos. Foram elaborados diversos documentos técnicos, como listas
de cabos, memórias de cálculo, desenhos técnicos, especificações de materiais e planos
de migração. O trabalho também revisou normas técnicas, como a NBR 5410 e
NBR 14039, garantindo a conformidade com os padrões de segurança e desempenho.
A modernização visa reduzir falhas, que podem resultar em prejuízos financeiros,
materiais e até mesmo em risco de vidas. Além de atualizar a infraestrutura e os equipamentos,
o projeto também melhora a captação e processamento dos dados das
medições de energia. A introdução de tecnologias avançadas permitirá uma melhor
integração com sistemas de monitoramento remoto e telemetria, facilitando o controle
e a manutenção preventiva, e reduzindo perdas. O projeto inclui uma análise dos impactos
econômicos e operacionais da modernização e da falta dela. A modernização
da UHE X é coordenada por uma empresa multinacional, com investimento bilionário,
substituindo mais de 100 mil quilômetros de cabos e centenas de quadros, e sendo
realizada com a usina em operação. O trabalho detalha o desenvolvimento do Projeto
Executivo de Migração, a confecção de documentos técnicos, o dimensionamento
dos cabos e o planejamento da migração. O objetivo principal é a aprovação dos documentos
pela Empresa Parceira e a aprovação pela Gerência da UHE X. Com 11
documentos aprovados pela Empresa Parceira e 3 aprovados pela UHE X, os resultados
atendem às expectativas, apesar dos atrasos nas entregas. O projeto demonstra
a aplicação dos conhecimentos adquiridos na formação em engenharia de controle e
automação. |
pt_BR |
dc.description.abstract |
Electricity is crucial for economic, social, and cultural development, and it is essential
in daily life. In Brazil, the power matrix is predominantly renewable, with a focus
on hydroelectric plants. However, obsolescence of equipment and deterioration of infrastructure
are common issues, exacerbated by the longevity of facilities and lack of
continuous improvements. Given Brazils dependence on hydroelectric power, modernization
is critical to ensure energy security, meet growing demand, and comply with
stringent efficiency and sustainability regulations. This work addresses the modernization
of the Billing Measurement System (BMS) at Hydroelectric Plant X a pseudonym
used to protect confidential information. The BMS is responsible for measuring and
pricing the generated energy, which is crucial for the plants financial and operational
viability. The project involves the design and development of the executive project, from
requirements gathering to final document approval. Various technical documents were
produced, including cable lists, detailed calculations, technical drawings, material specifications,
and migration plans. The work also reviewed technical standards, such as
NBR 5410 and NBR 14039, ensuring compliance with safety and performance standards.
The modernization aims to reduce failures that could lead to financial losses,
material damage, or even risk to lives. In addition to updating infrastructure and equipment,
the project enhances data capture and processing of energy measurements. Advanced
technologies will enable better integration with remote monitoring and telemetry
systems, facilitating control and preventive maintenance, and reducing losses. The
project also examines the economic and operational impacts of both modernization
and its absence. The modernization of Plant X, coordinated by a multinational company
with a billion-dollar investment, involves replacing over 100,000 kilometers of cables
and hundreds of panels while the plant remains operational. This work details the
development of the executive project, including technical documents, cable sizing, and
migration planning. The main objective is the acceptance of documents by the partner
company and approval by the Plant X Management. With 11 documents accepted and
3 approved, the results meet expectations despite delays. The project demonstrates
the application of knowledge acquired in control and automation engineering. |
pt_BR |
dc.format.extent |
108 p. |
pt_BR |
dc.language.iso |
pt_BR |
pt_BR |
dc.publisher |
Florianópolis, SC. |
pt_BR |
dc.rights |
Open Access. |
en |
dc.subject |
Sistema de Medição de Faturamento |
pt_BR |
dc.subject |
Usina Hidrelétrica |
pt_BR |
dc.subject |
Projeto Executivo |
pt_BR |
dc.subject |
Atualização Tecnológica |
pt_BR |
dc.subject |
Modernização |
pt_BR |
dc.subject |
Billing Measurement System |
pt_BR |
dc.subject |
Hydroelectric Power Plant |
pt_BR |
dc.subject |
Executive Project |
pt_BR |
dc.subject |
Technological Update |
pt_BR |
dc.subject |
Modernization |
pt_BR |
dc.title |
Atualização tecnológica de usina hidrelétrica: modernização do sistema de medição de faturamento e desenvolvimento de projeto executivo de migração |
pt_BR |
dc.type |
TCCgrad |
pt_BR |
dc.contributor.advisor-co |
Campaner, Ronni Márcio |
|