Estruturação das informações visando a obtenção da linha de balanceamento a partir do gráfico de gantt: estudo de caso

DSpace Repository

A- A A+

Estruturação das informações visando a obtenção da linha de balanceamento a partir do gráfico de gantt: estudo de caso

Show simple item record

dc.contributor Universidade Federal de Santa Catarina. pt_BR
dc.contributor.advisor Marchiori, Fernanda Fernandes
dc.contributor.author Ferreira, Lucas Rollin
dc.date.accessioned 2024-06-27T12:58:30Z
dc.date.available 2024-06-27T12:58:30Z
dc.date.issued 2024-05-17
dc.identifier.uri https://repositorio.ufsc.br/handle/123456789/255454
dc.description TCC (graduação) - Universidade Federal de Santa Catarina, Centro Tecnológico, Engenharia Civil. pt_BR
dc.description.abstract O planejamento e controle de obras são elementos essenciais para o sucesso de qualquer projeto. A complexidade do setor da construção civil, com sistemas temporários, projetos únicos e recursos compartilhados entre diversas frentes de trabalho, destaca a necessidade de métodos eficientes de planejamento. Na literatura, existem formas de planejamento baseado em atividades, como o Método do Caminho Crítico (CPM) que é indicado para obras com atividade singulares, e as formas de planejamento baseado em locais, como a Linha de Balanceamento (LOB) que se concentra nos locais de trabalho e no fluxo de equipes entre eles. O presente trabalho utiliza um estudo de caso em um edifício residencial multifamiliar para explorar uma forma de transformar um planejamento com Gráfico de Gantt para a LOB. O método proposto baseia-se na agregação de informações adicionais no software CPM, como os lotes de trabalho e a criação de uma visualização de LOB. Os resultados da pesquisa mostram como a adoção do planejamento baseado em locais tornou o cronograma menos complexo e facilitou a aplicação de princípios da lean construction, como o fluxo contínuo de produção. pt_BR
dc.description.abstract Planning and control of construction projects are essential elements for the success of any project. The complexity of the construction sector, with its temporary systems, unique projects, and shared resources across various work fronts, highlights the need for efficient planning methods. In the literature, there are activity-based planning methods such as the Critical Path Method (CPM), which is suitable for projects with singular activities, and location based planning methods such as Line of Balance (LOB), which focuses on work locations and the flow of teams between these locations. This study utilizes a case study in a multifamily residential building to explore a method of transforming a Gantt chart-based planning into LOB. The proposed method involves aggregating additional information in CPM software, such as work batches, and creating a LOB visualization. The research findings demonstrate how the adoption of location-based planning has made the schedule less complex and facilitated the application of lean construction principles such as continuous flow production. pt_BR
dc.format.extent 66 f. pt_BR
dc.language.iso por pt_BR
dc.publisher Florianópolis, SC. pt_BR
dc.rights Open Access. en
dc.subject Construção Civil pt_BR
dc.subject Planejamento de Obras pt_BR
dc.subject Gráfico de Gantt pt_BR
dc.subject Linha de Balanceamento pt_BR
dc.title Estruturação das informações visando a obtenção da linha de balanceamento a partir do gráfico de gantt: estudo de caso pt_BR
dc.type TCCgrad pt_BR


Files in this item

Files Size Format View Description
TCC.pdf 3.007Mb PDF View/Open TCC

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account

Statistics

Compartilhar