dc.contributor |
Universidade Federal de Santa Catarina. |
pt_BR |
dc.contributor.advisor |
Marchiori, Fernanda Fernandes |
|
dc.contributor.author |
Ferreira, Lucas Rollin |
|
dc.date.accessioned |
2024-06-27T12:58:30Z |
|
dc.date.available |
2024-06-27T12:58:30Z |
|
dc.date.issued |
2024-05-17 |
|
dc.identifier.uri |
https://repositorio.ufsc.br/handle/123456789/255454 |
|
dc.description |
TCC (graduação) - Universidade Federal de Santa Catarina, Centro Tecnológico, Engenharia Civil. |
pt_BR |
dc.description.abstract |
O planejamento e controle de obras são elementos essenciais para o sucesso de qualquer
projeto. A complexidade do setor da construção civil, com sistemas temporários, projetos
únicos e recursos compartilhados entre diversas frentes de trabalho, destaca a necessidade de
métodos eficientes de planejamento. Na literatura, existem formas de planejamento baseado em
atividades, como o Método do Caminho Crítico (CPM) que é indicado para obras com atividade
singulares, e as formas de planejamento baseado em locais, como a Linha de Balanceamento
(LOB) que se concentra nos locais de trabalho e no fluxo de equipes entre eles. O presente
trabalho utiliza um estudo de caso em um edifício residencial multifamiliar para explorar uma
forma de transformar um planejamento com Gráfico de Gantt para a LOB. O método proposto
baseia-se na agregação de informações adicionais no software CPM, como os lotes de trabalho
e a criação de uma visualização de LOB. Os resultados da pesquisa mostram como a adoção do
planejamento baseado em locais tornou o cronograma menos complexo e facilitou a aplicação
de princípios da lean construction, como o fluxo contínuo de produção. |
pt_BR |
dc.description.abstract |
Planning and control of construction projects are essential elements for the success of
any project. The complexity of the construction sector, with its temporary systems, unique
projects, and shared resources across various work fronts, highlights the need for efficient
planning methods. In the literature, there are activity-based planning methods such as the
Critical Path Method (CPM), which is suitable for projects with singular activities, and location based planning methods such as Line of Balance (LOB), which focuses on work locations and
the flow of teams between these locations. This study utilizes a case study in a multifamily
residential building to explore a method of transforming a Gantt chart-based planning into LOB.
The proposed method involves aggregating additional information in CPM software, such as
work batches, and creating a LOB visualization. The research findings demonstrate how the
adoption of location-based planning has made the schedule less complex and facilitated the
application of lean construction principles such as continuous flow production. |
pt_BR |
dc.format.extent |
66 f. |
pt_BR |
dc.language.iso |
por |
pt_BR |
dc.publisher |
Florianópolis, SC. |
pt_BR |
dc.rights |
Open Access. |
en |
dc.subject |
Construção Civil |
pt_BR |
dc.subject |
Planejamento de Obras |
pt_BR |
dc.subject |
Gráfico de Gantt |
pt_BR |
dc.subject |
Linha de Balanceamento |
pt_BR |
dc.title |
Estruturação das informações visando a obtenção da linha de balanceamento a partir do gráfico de gantt: estudo de caso |
pt_BR |
dc.type |
TCCgrad |
pt_BR |