dc.contributor |
Universidade Federal de Santa Catarina. |
pt_BR |
dc.contributor.advisor |
Bouzon, Marina |
|
dc.contributor.author |
Nunes, Raisa Gonçalves |
|
dc.date.accessioned |
2023-07-10T18:30:32Z |
|
dc.date.available |
2023-07-10T18:30:32Z |
|
dc.date.issued |
2023-06-28 |
|
dc.identifier.uri |
https://repositorio.ufsc.br/handle/123456789/248466 |
|
dc.description |
TCC(graduação) - Universidade Federal de Santa Catarina, Centro Tecnológico, Engenharia de Produção. |
pt_BR |
dc.description.abstract |
A adoção de novas tecnologias pela indústria de Arquitetura, Engenharia e Construção (AEC)
pode ser considerada tardia quando comparada a outras indústrias, entretanto o BIM (Building
Information Modeling) já é uma realidade mundial na gestão de projetos de construção. O BIM
evoluiu de uma tecnologia 3D para uma abordagem integrada que gerencia o projeto e os dados
ao longo do ciclo de vida do edifício. E embora suas vantagens sejam reconhecidas, há questões
ainda pouco desenvolvidas, como qualidade e métricas. Identificar os desafios na
implementação do BIM torna-se importante para gerenciá-los adequadamente. A combinação
de técnicas de gerenciamento ágil com o BIM pode resultar em uma coordenação
multidisciplinar mais eficiente, reduzindo retrabalho e melhorando a comunicação e
sequenciamento de tarefas. O estudo analisou os impactos no fluxo de trabalho de uma empresa
de projetos estruturais após a adoção do Building Information Modeling (BIM) sob a
perspectiva de três métricas do gerenciamento ágil de projetos. A implementação do BIM teve
como objetivo aumentar a produtividade e eficiência da empresa, resultando em benefícios em
comparação ao fluxo CAD. O método da pesquisa seguiu uma revisão de literatura sobre BIM
e gerenciamento ágil e escolha de uma cliente da empresa para ser analisada. Em sequência,
foram realizados o mapeamento dos processos e estruturação dos fluxos BIM e CAD que
atendem a esse cliente e coleta de dados sobre o fluxo a partir de um quadro Kanban. Por fim,
as métricas ágeis foram definidas, aplicadas e analisadas, assim como foram propostas
melhorias no fluxo. Na empresa estudada, o fluxo BIM apresenta vantagens em relação às
revisões e quantitativos, devido à sua automação, o que tornou as revisões mais rápidas e
precisas. No fluxo CAD, cada revisão exige uma checagem manual de várias partes do projeto.
Foram identificadas dificuldades relacionadas a um alto número de revisões e ao não
cumprimento dos prazos. Essas dificuldades foram atribuídas à falta de comunicação entre as
partes do projeto, baixa maturidade dos modelos BIM, saturação do trabalho em progresso
(WIP), falta de procedimentos de controle e treinamento inadequado dos colaboradores. Com
base nessas dificuldades, foram propostas sugestões de melhoria em três níveis: estratégia,
produção e gestão do fluxo. Sugere-se, para pesquisas futuras, concluir o ciclo de feedback
proposto, comparar os fluxos de empresas com maior maturidade BIM e estender a aplicação
de métricas ágeis a todas as disciplinas e fases do processo de projeto. Em suma, o estudo
alcançou seu objetivo de avaliar os impactos no fluxo de trabalho de uma empresa de projetos
estruturais após a adoção do BIM utilizando métricas ágeis, e apresentou possibilidades para
pesquisas futuras. |
pt_BR |
dc.description.abstract |
The adoption of new technologies by the Architecture, Engineering and Building industry can
be considered late if compared with other industries. On the other hand, the methodology BIM
(Building Information Modeling) is already a worldwide reality in construction project
managing. BIM has evolved from a 3D technology to an integrated approach that manages the
project and dada throughout the life cycle of a building. Even though its advantages are
acknowledged, there are still issues little evolved, such as quality and metrics. Identifying the
challenges of BIM implementation becomes important to properly management. The
combination of techniques and agile management altogether with BIM, can result in more
efficient multidisciplinary coordination, reducing rework and improving communication and
tasks sequencing. The study has analyzed the workflow of a structural projects company after
adopting the Building Information Modeling (BIM) methodology, under the perspective of the
project’s agile management metrics. The adoption of such an approach had as its main objective
to increase productivity and efficiency of the company, achieving better results if compared
with Computer Aided Design (CAD) method. The method of the research has followed a
literature review on BIM and agile management, and the selection of one of the company’s
clients to be analyzed. Afterwards, the mapping of the processes and the structuring of the BIM
and CAD methods that assist this specific client, as well as the dada collection on the workflow
through a Kanban chart were applied. Lastly, the agile metrics were defined, applied, and
analyzed, and some improvements on the workflow were suggested. The BIM workflow has
shown advantages regarding the revisions and project quantitative by virtue of its automation,
which has made the revisions faster and more precise. In the CAD workflow, every revision
demands a manual checking for many parts of the project. Some issues have been identified
due to a high number of revisions and non-compliance with deadlines. Such issues have been
assigned to the lack of communication, low maturity of BIM models, saturation of Work in
Progress (WIP), lack of control procedures and inadequate training to collaborators. Based on
the issues listed above, suggestions have been proposed for the three levels of planning:
strategy, production, and workflow. For further investigation, it is suggested the conclusion of
the feedback cycle, the comparison of companies with a higher maturity of BIM method, and
the extension of agile metrics to all disciplines and of the project’s process. In summary, the
study has reached its goal of assessing the impact on the workflow of a structural projects
company after adopting BIM and the usage of agile metrics and has presented possibilities for
future research. |
pt_BR |
dc.format.extent |
120 p. |
pt_BR |
dc.language.iso |
pt_BR |
pt_BR |
dc.publisher |
Florianópolis, SC. |
pt_BR |
dc.rights |
Open Access. |
en |
dc.subject |
Métodos Ágeis |
pt_BR |
dc.subject |
Métricas Ágeis |
pt_BR |
dc.subject |
BIM (Building Information Modeling) |
pt_BR |
dc.subject |
Agile Methods |
pt_BR |
dc.subject |
Agile Metrics |
pt_BR |
dc.title |
Gestão Ágil e BIM: Análise dos impactos da implementação do BIM em uma empresa de projetos estruturais sob a perspectiva de métricas ágeis |
pt_BR |
dc.type |
TCCgrad |
pt_BR |